This site does not support the operation of Internet Explorer.
We apologize for the inconvenience, but please use a browser such asMicrosoft Edge
or
Google Chrome,
Firefox
to view this site.
If you are a local government or a company, please feel free to send us your inquiry usingthis form after agreeing to the Privacy Policy.
*When making inquiries, it is considered that you have agreed to the above privacy policy.
“Zippar” is a transportation system that contributes to urban development.
We have found value in the space on the road, which has been a dead space until today.
With Zippar, which has excellent convenience, safety and economy,
we will create a world without traffic congestion, and where everyone can easily access the station.
Compared to the existing monorail, Zipper costs about 1/5 (1.5 billion yen/ km) and can be constructed in 1 year.
Unlike the existing ropeway, Zippar has an independent rope and carrier, so curves and branches are free to create for designing a flexible route.
By automatic driving, there is no need to be bothered by shortage of drivers. It is also free to adjust the number of vehicles according to rush hours or routes depending on users’ amount.
The safety of the drive unit will be approved in 2024. Zippar adopts a two-rope type that can operate up to 30m/s wind speed.(1.5 times the wind speed of a single-rope type ropeway can operate.)
The X-frame, which encloses the entire cabin from below, provides a great sense of security and inclusiveness. It is a design that gives a sense of security and safety as a public transportation system.
We aim for a natural design that blends into the cityscape. With its advanced but not overly assertive shape and color design, it blends naturally into the cityscape without any discomfort.
Takamasa Suchi
CEO
Mario Ian Carlos
Ferido Rebonquin
Director & Head of Business Development
Manabe Yasumasa
Outside Director
Tsuyoshi Sakamoto
Outside Director
Sou Yanbe
Outside Director
Yusuke Tomura
Auditor
Ikematsu Kunihiko
Executive Adviser
Seiichi Kantake
Executive Adviser
Name | Zip Infrastructure, Inc. |
Domain |
|
Address | Zip Infrastructure, Inc. HQ Minamisoma Incubation Center 45-245 Kaibama Sukakeba, Haramachi, Minamisoma, Fukushima |
Board member | Takamasa Suchi CEO |
Found | July 20, 2018 |
Capital | 185.48 million yen (Including capital reserves) |
・5 minutes by taxi from JR Joban Line's Haranomachi Station
・30 minutes from Joban Futaba Interchange by car
If you have any inquiries about Zip Infrastructure Corporation or Zippar, please feel free to send them to us using this form after agreeing to our privacy policy.
*When making inquiries, it is considered that you have agreed to the above privacy policy.
© 2024 Zip Infrastructure, Inc.